Forensic Calibration State · KOKON_FORENSIC_CALIBRATION_REMEDIATION_V1

DGA · loading…
Load-bearing framing. A/B/C infrastructure is shipped; detector calibration evidence remains at S1 · best-effort measured until independent CURATED OOS corpus is populated (≥ 250 per branch) and quarterly metrics are published. This is NOT "A/B/C closed" · the distinction is load-bearing for sales, procurement, and regulator conversation.
Say-vs-cannot-say · procurement + sales

Can say

  • KOKON has deterministic forensic emission, adjudication ledger, and calibration framework.
  • FP/FN methodology is fixed (Wilson CI + Brier + LogLoss + zero-outcome freeze at N=20 · preliminary at 20-249 · published at N ≥ 250).
  • Numeric commitments start after CURATED corpus reaches threshold per branch.
  • DECISION_GRADE emission is hard-refused at the emitter until branch reaches COMMITTED_S2.
  • Two-branch discipline (hidden_loss + aml_forensics) with disjoint labeled corpora.

Cannot say

  • Validated AML detector with committed precision/recall.
  • False-positive rate guaranteed.
  • A/B/C closed (correct: A/B/C infrastructure shipped, evidence pending curation).
  • Landmark public cases (Enron · Wirecard · HSBC · 1MDB · etc.) as calibration data — they are SCHEMA_DEMONSTRATION only.
  • DECISION_GRADE authorization on any KOKON output while any branch is at S1.

Per-branch corpus stage + disclosure gate

Canonical rows · per (branch, detector, F-code) tuple